中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0026-5187
刊名Mining Engineering
参考译名采矿工程
收藏年代1998~2013



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013

2000, vol,52, no.2 2000, vol,52, no.3 2000, vol,52, no.4 2000, vol,52, no.6 2000, vol.52, no.1 2000, vol.52, no.10
2000, vol.52, no.11 2000, vol.52, no.12 2000, vol.52, no.2 2000, vol.52, no.3 2000, vol.52, no.4 2000, vol.52, no.6
2000, vol.52, no.8 2000, vol.52, no.9

题名作者出版年年卷期
Using passive treatment systems for mine closure-a good approach or a risky alternative?P. Eger; G. Melchert; J. Wagner20002000, vol.52, no.9
Mountaintop removal controversy slows west Virginia coal miningSyd S. Peng20002000, vol.52, no.9
Mine planning software models empire mine oreAllan E. Koski20002000, vol.52, no.9
Integrated bioreactor system for the treatment of cyanide, metals and nitrates in mine process waterM. Canty; R. Hiebert; L. Thompson; P. Clark; S. Beckman20002000, vol.52, no.9
Improvements seen in acid-mine-drainage technologyWilliam R. Yernberg20002000, vol.52, no.9
Foamed grout controls underground coal-mine fireJoseph J. Feiler; Gary J. Colaizzi; Carol Carder20002000, vol.52, no.9
Bulk sorting by LIF: quality control of ores for bulk sorting and blending by laser-induced fluorescence analysisH. F. Broicher20002000, vol.52, no.9
Remote-control monitoring cuts maintenance costsMichael W. Lewis20002000, vol.52, no.8
Parametric analysis in surface-mine reserve definition: the inherent error and its correctionM. Lemieux20002000, vol.52, no.8
Internal rate of return (IRR) - a flawed and dysfunctional project-evaluation criterionM. M. Hajdasinski20002000, vol.52, no.8
123456