中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0953-7287
刊名Production Planning & Control
参考译名生产规划与控制
收藏年代1999~2024



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2000, vol.11, no.1 2000, vol.11, no.2 2000, vol.11, no.3 2000, vol.11, no.4 2000, vol.11, no.5 2000, vol.11, no.6
2000, vol.11, no.7 2000, vol.11, no.8

题名作者出版年年卷期
A data model for generalized scheduling for virtual enterpriseT. Lecompte; J. C. Deschamps; J. P. Bourrieres20002000, vol.11, no.4
A decomposition technique for quantifying real process performanceB. W. Ang; F. Q. Zhang; E. P. Chew20002000, vol.11, no.4
A hybrid push/pull control algorithm for multistage, multi-line production systemsBenita M. Beamon; Jose M. Bermudo20002000, vol.11, no.4
A lot grouping algorithm for a continuous slab caster in an integrated steel millSoo Y. Chang; Myong-Rae Chang; Yushin Hong20002000, vol.11, no.4
Activity-based management in a small company: a case studyA. Gunasekaran; R. McNeil; D. Singh20002000, vol.11, no.4
Benchmarking for small- to medium-sized enterprisesJ. Coulter; N. S. Baschung; U. S. Bititci20002000, vol.11, no.4
Generating a backlog list for a CONWIP production line: a simulation studyBor-Yuh Leu20002000, vol.11, no.4
On vendor part delivery dates in a stochastic assembly systemSubhash G. Sarin; Rajiv K. Srivastava20002000, vol.11, no.4
Optimal payment time under permissible delay in payment for products with deteriorationBhaba R. Sarker; A. M. M. Jamal; Shaojun Wang20002000, vol.11, no.4
Some structural properties for the just-in-time level schedule problemHenry Aigbedo20002000, vol.11, no.4
12