中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0953-7287
刊名Production Planning & Control
参考译名生产规划与控制
收藏年代1999~2024



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2002, vol.13, no.1 2002, vol.13, no.2 2002, vol.13, no.3 2002, vol.13, no.4 2002, vol.13, no.5 2002, vol.13, no.6
2002, vol.13, no.7 2002, vol.13, no.8

题名作者出版年年卷期
An excursion in scheduling theory: an overview of scheduling research in the twentieth centuryJatinder N. D. Gupta20022002, vol.13, no.2
Due date assignment and scheduling: SLK, TWK and other due date assignment modelsValery S. Gordon; Jean-Marie Proth; Chengbin Chu20022002, vol.13, no.2
Optimal idle time insertion in early-tardy parallel machines scheduling with precedence constraintsFederico Della Croce; Marco Trubian20022002, vol.13, no.2
Comparing meta-heuristic approaches for parallel machine scheduling problemsAlexandre S. Mendes; Felipe M. Muller; Paulo M. Franca; Pablo Moscato20022002, vol.13, no.2
Application of genetic algorithms for scheduling batch-discrete production systemBokang Kim; Sooyoung Kim20022002, vol.13, no.2
On transforming job-shops into flow-shopsJose M. Framinan; Rafael Ruiz-Usano20022002, vol.13, no.2
An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup timesChristian Artigues; Francois Roubellat20022002, vol.13, no.2
Production planning for a project job shop, with application to disassembly, evaluation and maintenance of nuclear weaponsLinda K. Nozick; Mark A. Turnquist; Craig R. Lawton; G. F. List; Dean A. Jones; Stephen T. Wright; Edwin A. Kjeldgaard20022002, vol.13, no.2
Sequencing mixed model assembly lines for a just-in-time production systemJose A. Ventura; Sanjay Radhakrishnan20022002, vol.13, no.2
A simulation study comparing performance of CONWIP and bottleneck-based release rulesWendell G. Gilland20022002, vol.13, no.2
12