中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0953-7287
刊名Production Planning & Control
参考译名生产规划与控制
收藏年代1999~2024



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2003, vol.14, no.1 2003, vol.14, no.2 2003, vol.14, no.3 2003, vol.14, no.4 2003, vol.14, no.5 2003, vol.14, no.6
2003, vol.14, no.7 2003, vol.14, no.8

题名作者出版年年卷期
A new EPQ model: integrating lower pricing, rework and reject situationsW. M. CHAN; R. N. IBRAHIM; P. B. LOGHERT20032003, vol.14, no.7
A simple integrated production policy of an imperfect item for vendor and buyerSURESH KUMAR GOYAL; GHAO-KUEI HUANG; KUO-GHAO CHEN20032003, vol.14, no.7
An optimal design for process quality improvement: modelling and applicationJEN-MING CHEN; JIA-CHI TSOU20032003, vol.14, no.7
Developing a questionnaire for the four-stage model of operations strategyDAVID BARNES; FRANK ROWBOTHAM20032003, vol.14, no.7
Scheduling material handling vehicles in a container terminalSANCHOY K. DAS; LAZAR SPASOVIG20032003, vol.14, no.7
Distribution lot-sizing models for arborescent supply chains with discrete-period variable demandHUAN NENG CHIU; YI SHYANG LEE; CHUN YEN TSENG20032003, vol.14, no.7
Transforming an MRP plan into a short-term scheduleH. A. J. CRAUWELS; D. VAN OUDHEUSDEN20032003, vol.14, no.7
Analysis of a batch machine fed by an unreliable discrete machineJOONHWAN IN; YUSHIN HONG; GHI-HYUGK JUN20032003, vol.14, no.7
WebATP: a Web-based flexible available-to-promise computation systemM. H. XIONG; S. B. TOR; L. P. KHOO20032003, vol.14, no.7
A note on the production and inventory systems taking account of time valueYUNG-FU HUANG; KUN-JEN CHUNG20032003, vol.14, no.7