中国机械工程学会生产工程分会知识服务平台
主页
文献资源
外文期刊
外文会议
中文期刊
专业机构
生产工程
智能制造
高级检索
关于我们
版权声明
使用帮助
期刊
ISSN
0306-400X
刊名
International Water Power & Dam Construction
参考译名
水电与水坝建设
收藏年代
1998~2007
全部
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2004, vol.56, no.1
2004, vol.56, no.10
2004, vol.56, no.11
2004, vol.56, no.12
2004, vol.56, no.2
2004, vol.56, no.3
2004, vol.56, no.4
2004, vol.56, no.5
2004, vol.56, no.6
2004, vol.56, no.7
2004, vol.56, no.8
2004, vol.56, no.9
题名
作者
出版年
年卷期
Natural reaction: From the very beginning, the Andevalo dam project has attempted not only to minimise harm to the environment, but to actually improve the conditions of the natural surroundings, says Javier Milans
Carrieann Davies
2004
2004, vol.56, no.6
Access all areas
Debra Flickinger
2004
2004, vol.56, no.6
Enter the matrix
Harald Schmid
2004
2004, vol.56, no.6
Smooth operator: the combination of better design and the use of protective coatings is an effective way of reducing abrasive erosion of hydro power turbines
Carrieann Davies
2004
2004, vol.56, no.6
Design criteria
Martin Wieland
2004
2004, vol.56, no.6
RCC first for Portugal: Francisco Ortega, Cerqueira Bastos and Paulo Alves discuss the site planning, construction methods and alternative design features of Pedrogao dam, the first RCC dam to be constructed in Portugal
Martin Wieland
2004
2004, vol.56, no.6
Cool under pressure: Construction work on China's Longsbou power station took only 17 months in the face of extreme constinental climate conditions, writes
Su Yong
2004
2004, vol.56, no.6
On ice
Lawrence Williams
2004
2004, vol.56, no.6
Turkish delight: IWP&DC takes a look at some of the major developments and key players in the turkish by dro power industry as part of a special country focus
Martin Wieland
2004
2004, vol.56, no.6
国家科技图书文献中心
全球文献资源网
京ICP备05055788号-26
京公网安备11010202008970号 机械工业信息研究院 2018-2024