中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0306-400X
刊名International Water Power & Dam Construction
参考译名水电与水坝建设
收藏年代1998~2007



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007

2005, vol.57, no.1 2005, vol.57, no.10 2005, vol.57, no.11 2005, vol.57, no.12 2005, vol.57, no.2 2005, vol.57, no.3
2005, vol.57, no.4 2005, vol.57, no.5 2005, vol.57, no.6 2005, vol.57, no.7 2005, vol.57, no.8 2005, vol.57, no.9

题名作者出版年年卷期
In the public domain: Neil Ford considers the public face of dam construction and how far hydroelectricity has come to being an accepted form of energyCarrieann Davies20052005, vol.57, no.4
Tapping the potential: Africa represents a vast region of potential hydro power, and although there are certain obstacles, the continent's hydro presence is on the increaseCarrieann Davies20052005, vol.57, no.4
A tour of Tanzania: The Yearbook 2005 will be published shortly. As a preview to the country profiles section, Leonard Kassana gives an overview of hydro power in TanzaniaLeonard B. Kassana20052005, vol.57, no.4
Second stageM. M. Madaan20052005, vol.57, no.4
High tide: Long considered but rarely realised, innovative techniques to harness the energy of the tides are now set to usher in a whole new era of hydro power generationDavid Appleyard20052005, vol.57, no.4
Change of speed: Variable speed units for pumped storage power plants are becoming a state-of-the-art technology for optimised efficiency in turbine mode and a wide range of power control in the pump modeK. Scherer20052005, vol.57, no.4
Part of the designN. Sharma; D. Das; R. Shukla20052005, vol.57, no.4