中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0953-7287
刊名Production Planning & Control
参考译名生产规划与控制
收藏年代1999~2024



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2006, vol.17, no.1 2006, vol.17, no.2 2006, vol.17, no.3 2006, vol.17, no.4 2006, vol.17, no.5 2006, vol.17, no.6
2006, vol.17, no.7 2006, vol.17, no.8

题名作者出版年年卷期
Operational planning and control of semiconductor wafer productionJ. N. D. GUPTA; R. RUIZ; J. W. FOWLER; S. J. MASON20062006, vol.17, no.7
A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabsJ. R. MONTOYA-TORRES20062006, vol.17, no.7
Developing a 3D layout for wafer fabrication plantsB. GOLANY; A. GUREVICH; E. PAZ PUZAILOV20062006, vol.17, no.7
Capacity allocation model for photolithography workstation with the constraints of process window and machine dedicationS. H. CHUNG; C. Y. HUANG; A. H. I. LEE20062006, vol.17, no.7
Semiconductor inventory management with multiple grade parts and downgradingG. GALLEGO; K. KATIRCIOGLU; B. RAMACHANDRAN20062006, vol.17, no.7
The FABMAS multi-agent-system prototype for production control of water fabs: design, implementation and performance assessmentL. MONCH; M. STEHLI; J. ZIMMERMANN; I. HABENICHT20062006, vol.17, no.7
Scheduling setup changes at bottleneck workstations in semiconductor manufacturingZ. DUWAYRI; M. MOLLAGHASEMI; D. NAZZAL; G. RABADI20062006, vol.17, no.7
A branch and bound algorithm to minimize total weighted tardiness on a single batch processing machine with ready times and incompatible job familiesS. K. TANGUDU; M. E. KURZ20062006, vol.17, no.7
Improving preventive maintenance scheduling in semiconductor fabrication facilitiesA. CRESPO MARQUEZ; J. N. D. GUPTA; J. P. IGNIZIO20062006, vol.17, no.7