中国机械工程学会生产工程分会知识服务平台
主页
文献资源
外文期刊
外文会议
中文期刊
专业机构
生产工程
智能制造
高级检索
关于我们
版权声明
使用帮助
期刊
ISSN
0746-4134
刊名
Gas Turbine World
参考译名
燃气轮机世界
收藏年代
1998~2024
全部
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2006, vol.36, no.1
2006, vol.36, no.2
2006, vol.36, no.3
2006, vol.36, no.4
2006, vol.36, no.5
2006, vol.36, no.6
题名
作者
出版年
年卷期
First Trent 60 genset package at 96% availability in cogen service - Launch production engine has averaged over 7,000 hours of commercial cogeneration operation in each of the last two years with close to 96% plant availability
Robert Farmer
2006
2006, vol.36, no.1
1500 MW power and water plant exceeding design output ratings
Colin Ashmore
2006
2006, vol.36, no.1
Refinery IGCC plants are exceeding 90% capacity factor after 3 years - Steep learning curves for commercial IGCC plants in Italy show annual capacity factors of 55-60% in the first year of service and improvement to over 90% after the third year
Harry Jaeger
2006
2006, vol.36, no.1
Diagnostic health monitoring will reduce new technology O&M risk - Intelligent diagnostic systems help avoid excessive outages and costly component replacement by calling for corrective action before problems have time to become failures
Irwin Stambler
2006
2006, vol.36, no.1
国家科技图书文献中心
全球文献资源网
京ICP备05055788号-26
京公网安备11010202008970号 机械工业信息研究院 2018-2024