中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2006, vol.27, no.11-12 2006, vol.27, no.3-4 2006, vol.27, no.5-6 2006, vol.27, no.7-8 2006, vol.27, no.9-10 2006, vol.28, no.11-12
2006, vol.28, no.1-2 2006, vol.28, no.3-4 2006, vol.28, no.5-6 2006, vol.28, no.7-8 2006, vol.28, no.9-10 2006, vol.29, no.11-12
2006, vol.29, no.1-2 2006, vol.29, no.3-4 2006, vol.29, no.5-6 2006, vol.29, no.7-8 2006, vol.29, no.9-10 2006, vol.30, no.11-12
2006, vol.30, no.1-2 2006, vol.30, no.3-4 2006, vol.30, no.5-6 2006, vol.30, no.7-8 2006, vol.30, no.9-10 2006, vol.31, no.1-2
2006, vol.31, no.3-4 2006, vol.31, no.5-6

题名作者出版年年卷期
Behavioural modelling for design decomposition and design equations derivationY.-M. Deng; D. Zheng20062006, vol.29, no.11-12
Flank milling of a ruled surface with conical tools - an optimization approachChenggang Li; Sanjeev Bedi; Stephen Mann20062006, vol.29, no.11-12
Time series modeling and spectrum analysis for chatter mode in endmilling dynamicsMoon-chill Yoon; Do-hun Chin20062006, vol.29, no.11-12
A microslip model of the bonding process in ultrasonic wire bonders, part II: steady teady state responseC. M. Hu; N. Guo; H. Du; X. M. Jian20062006, vol.29, no.11-12
Enhanced STLTong Wu; Edmund H. M. Cheung20062006, vol.29, no.11-12
A compact data structure for implementing loop subdivisionShiqi Ou; Hongzan Bin20062006, vol.29, no.11-12
Application of mahalanobis distance as a lean assessment metricJayanth Srinivasaraghavan; Venkat Allada20062006, vol.29, no.11-12
A new offset algorithm for closed 2D lines with IslandsHyun-Chul Kim; Sung-Gun Lee; Min-Yang Yang20062006, vol.29, no.11-12
An accurate three-dimensional scanning system with a new phase error compensation methodJiang Tao; Xi Juntong; Yan Junqi20062006, vol.29, no.11-12
A branch and bound procedure for the reentrant permutation flow-shop scheduling problemJen-Shiang Chen20062006, vol.29, no.11-12
12