中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0951-192X
刊名International Journal of Computer Integrated Manufacturing
参考译名国际计算机集成制造杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2007, vol.20, no.1 2007, vol.20, no.2-3 2007, vol.20, no.4 2007, vol.20, no.5 2007, vol.20, no.6 2007, vol.20, no.7
2007, vol.20, no.8

题名作者出版年年卷期
Workflow-based dynamic scheduling of job shop operationsH. C. HWANG; B. K. CHOI20072007, vol.20, no.6
Model-driven design and implementation of discrete event control for a machine tool control systemY. LIU; W. LI; K. YAMAZAKI; M. FUJISHIMA20072007, vol.20, no.6
Due date quoting and scheduling interaction in production linesA. ALFIERI20072007, vol.20, no.6
Structured metadata for representation, query and retrieval of behaviour models of virtual productsT.-L. SUN20072007, vol.20, no.6
Quantifying the flexibility of a manufacturing system by applying the transfer functionK. ALEXOPOULOS; N. PAPAKOSTAS; D. MOURTZIS; P. GOGOS; G. CHRYSSOLOURIS20072007, vol.20, no.6
An end-of-life decision support tool for product recovery considerations in the footwear industryT. STAIKOS; S. RAHIMIFARD20072007, vol.20, no.6
An ant colony optimization algorithm for scheduling virtual cellular manufacturing systemsK. L. MAK; P. PENG; X. X. WANG; T. L. LAU20072007, vol.20, no.6
Process classes deployed in manufacturing enterprisesR. H. WESTON; A. GUERRERO; K. A. CHATHA20072007, vol.20, no.6
Fuzzy multi-objective optimization for network design of integrated e-supply chainsM. DOTOLI; M. P. FANTI; A. M. MANGINI20072007, vol.20, no.6