中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2011, vol.60, no.1 2011, vol.60, no.2 2011, vol.60, no.3 2011, vol.60, no.4 2011, vol.61, no.1 2011, vol.61, no.2
2011, vol.61, no.3 2011, vol.61, no.4

题名作者出版年年卷期
Organizing the operation of radial machine sequencers for multiple PCB typesCsaba Raduly-Baka; Timo Knuutila; Mika Johnsson; Olli S. Nevalainen20112011, vol.61, no.4
An efficient local search scheme for minimizing mean absolute deviation of completion timesAnjulika Gupta; Prabha Sharma20112011, vol.61, no.4
Inverse data envelopment analysis model to preserve relative efficiency values: The case of variable returns to scaleSaowanee Lertworasirikul; Peerayuth Charnsethikul; Shu-Cherng Fang20112011, vol.61, no.4
Initialization strategies to enhancing the performance of genetic algorithms for the p-median problemXiang Li; Ningchuan Xiao; Christophe Claramunt; Hui Lin20112011, vol.61, no.4
A multi-criteria optimal replacement policy for a system subject to shocksChin-Chih Chang; Shey-Huei Sheu; Yen-Luan Chen; Zhe George Zhang20112011, vol.61, no.4
Computerized task risk assessment using digital human modeling based Job Risk Classification ModelRenran Tian; Vincent G. Duffy20112011, vol.61, no.4
Coordination of cooperative advertising models in a one-manufacturer two-retailer supply chain systemSheng-Dong Wang; Yong-Wu Zhou; Jie Min; Yuan-Guang Zhong20112011, vol.61, no.4
Combining Bayesian Networks and Total Cost of Ownership method for supplier selection analysisIbrahim Dogan; Nezir Aydin20112011, vol.61, no.4
Developing a two stage stochastic programming model of the price and lead-time decision problem in the multi-class make-to-order firmS. Kamal Chaharsooghi; Mahboobeh Honarvar; M. Modarres; Isa Nakhai Kamalabadi20112011, vol.61, no.4
A methodology for joint optimization for maintenance planning, process quality and production schedulingDivya Pandey; Makarand S. Kulkarni; Prem Vrat20112011, vol.61, no.4
12345