中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0736-5845
刊名Robotics and Computer Integrated Manufacturing
参考译名机器人学与计算机集成制造
收藏年代1997~2023

关联期刊参考译名收藏年代
Computer Integrated Manufacturing Systems计算机集成制造系统1998~1998


全部

1997 1998 1999 2000 2001 2002
2003 2004 2005 2006 2007 2008
2009 2010 2011 2012 2013 2014
2015 2016 2017 2018 2019 2020
2021 2022 2023

2011, vol.27, no.1 2011, vol.27, no.2 2011, vol.27, no.3 2011, vol.27, no.4 2011, vol.27, no.5 2011, vol.27, no.6

题名作者出版年年卷期
Relations between volume flexibility and part cost in assembly linesMathias Jonsson; Carin Andersson; Jan-Eric Stahl20112011, vol.27, no.4
Optimization of multi-task turning operations under minimal tool waste considerationYi-Chi Wang; Yi-Che Chiu; Yu-Peng Hung20112011, vol.27, no.4
A web-based approach for exceptions management in the supply chainEsther Alvarez; Fernando Diaz20112011, vol.27, no.4
A synergy of multi-objective optimization and data mining for the analysis of a flexible flow shopCatarina Dudas; Marcus Frantzen; Amos H. C. Ng20112011, vol.27, no.4
A simulation-based scheduling system for real-time optimization and decision making supportMarcus Frantzen; Amos H. C. Ng; Philip Moore20112011, vol.27, no.4
High speed pocket milling planning by feature-based machining area partitioningEun-Young Heo; Dong-Won Kim; Jong-Young Lee; Cheol-Soo Lee; F. Frank Chen20112011, vol.27, no.4
Spot-welding sequence planning and optimization using a hybrid rule-based approach and genetic algorithmMohammad Givehchi; Amos H. C. Ng; Lihui Wang20112011, vol.27, no.4
A comparison between the Denavit-Hartenberg and the screw-based methods used in kinematic modeling of robot manipulatorsC. R. Rocha; C. P. Tonetto; A. Dias20112011, vol.27, no.4
Implementing ISO standard 10303 application protocol 224 for automated process planningDaniel Kretz; Tobias Teich; Joerg Militzer; Tim Neumann20112011, vol.27, no.4
Building blocks for adaptable factory systemsSebastian Horbach; Jorg Ackermann; Egon Muller; Jens Schutze20112011, vol.27, no.4
123