中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0305-215X
刊名Engineering Optimization
参考译名工程最优化
收藏年代1998~2024



全部

1998 1999 2000 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2011, vol.43, no.1 2011, vol.43, no.10/12 2011, vol.43, no.2 2011, vol.43, no.3 2011, vol.43, no.4 2011, vol.43, no.5
2011, vol.43, no.6 2011, vol.43, no.7 2011, vol.43, no.8 2011, vol.43, no.9

题名作者出版年年卷期
An inventory-theory-based interval-parameter two-stage stochastic programming model for water resources managementM. Q. Suo; Y. P. Li; G. H. Huang20112011, vol.43, no.9
Quay crane scheduling for an indented berthDer-Horng Lee; Jiang Hang Chen; Jin Xin Cao20112011, vol.43, no.9
Disruption recovery model for berth and quay crane scheduling in container terminalsQingcheng Zeng; ZhongzhenYang; Xiangpei Hu20112011, vol.43, no.9
The constraints satisfaction problem approach in the design of an architectural functional layoutMachi Zawidzki; Kazuyoshi Tateyama; Ikuko Nishikawa20112011, vol.43, no.9
Towards automating the discovery of certain innovative design principles through a clustering-based optimization techniqueSunith Bandaru; Kalyanmoy Deb20112011, vol.43, no.9
Design improvement of cooling channel layout for plastic injection mouldingTadayoshi Matsumori; Koetsu Yamazaki20112011, vol.43, no.8
Optimal water resource planning under fixed budget by interval-parameter credibility constrained programmingY. M. Zhang; G. H. Huang20112011, vol.43, no.8
A heuristic for constrained T-shape cutting patterns of circular itemsYaodong Cui; Baixiong Huang20112011, vol.43, no.8
Solving constrained optimization problems with a hybrid particle swarm optimization algorithmLeticia Cecilia Cagnina; Susana Cecilia Esquivel; Carlos A. Coello Coello20112011, vol.43, no.8
Optimizing a realistic large-scale frequency assignment problem using a new parallel evolutionary approachJose M. Chaves-Gonzalez; Miguel A. Vega-Rodriguez; Juan A. Gomez-Pulido; Juan M. Sanchez-Perez20112011, vol.43, no.8
1234567