中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0039-0895
刊名HPAC Engineering
参考译名供暖、管道、空调
收藏年代1998~2024



全部

1998 1999 2000 2004 2005 2006
2007 2008 2009 2010 2011 2012
2013 2014 2015 2016 2017 2018
2019 2020 2021 2022 2023 2024

2011, vol.83, no.1 2011, vol.83, no.10 2011, vol.83, no.11 2011, vol.83, no.12 2011, vol.83, no.2 2011, vol.83, no.3
2011, vol.83, no.4 2011, vol.83, no.5 2011, vol.83, no.5 SUPPL. 2011, vol.83, no.6 2011, vol.83, no.7 2011, vol.83, no.8
2011, vol.83, no.9

题名作者出版年年卷期
Army-built exhaust-gas boilers take chill off the ArcticJoanne Castagna20112011, vol.83, no.1
The Advantages of Higher Boiler Turndowns: Higher turndowns influence stability of hydronic systemsPeter Rimassa20112011, vol.83, no.1
Boiler Combo Helps Manufacturer Achieve Cost and Flexibility Goals: Gas/electric switching saves up to 8 percent on energyMichael Weil20112011, vol.83, no.1
Variable-Frequency Drive Improves Boiler Operation: Reduces energy costs, maintenance, noise and vibrationJEFF EISENHAUER; DEAN WILLIAMS20112011, vol.83, no.1
Boilers Helping to Usher in New Age of Hydronics: Hydronic equipment provides efficiency, system flexibilityJohn Vastyan20112011, vol.83, no.1
A seemingly forgotten energy-efficiency opportunity: Evaporative-Cooling-Enhanced Runaround-Coil Heat RecoveryMIRZA M. SHAH20112011, vol.83, no.1
Modular Central Plant Yields Cost Savings and More Classroom Space for College: Equipment helps to keep project on tight scheduleMichael Weil20112011, vol.83, no.1
Consultant/Author Publishes List of top 10 Green-Building TrendsMichael Weil20112011, vol.83, no.1
Cutting a Facility's Cooling CostsJIM BERRY20112011, vol.83, no.1
The True Cost of LEED-Certified Green Buildings: Columnist examines what contributes to the higher price tags of green designsStephen J. Vamosi20112011, vol.83, no.1