中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0039-0895
刊名HPAC Engineering
参考译名供暖、管道、空调
收藏年代1998~2024



全部

1998 1999 2000 2004 2005 2006
2007 2008 2009 2010 2011 2012
2013 2014 2015 2016 2017 2018
2019 2020 2021 2022 2023 2024

2011, vol.83, no.1 2011, vol.83, no.10 2011, vol.83, no.11 2011, vol.83, no.12 2011, vol.83, no.2 2011, vol.83, no.3
2011, vol.83, no.4 2011, vol.83, no.5 2011, vol.83, no.5 SUPPL. 2011, vol.83, no.6 2011, vol.83, no.7 2011, vol.83, no.8
2011, vol.83, no.9

题名作者出版年年卷期
Biomass-Fueled Heating Plant at Heart of University's Energy-Retrofit Program: Nearly $13 million in cost savings and countingScott Arnold20112011, vol.83, no.3
Avoiding Human-Error-Induced Data-Center Downtime: Simple steps to averting disaster and ensuring facilities remain up and runningMark Cousino20112011, vol.83, no.3
Illinois Village Uses Heat-Recovery Chiller to Boost Efficiency of Police Station: Air-cooled unit provides required reheat capacityScott Arnold20112011, vol.83, no.3
Energy Retrofits: When Is the Time to Act? Existing buildings' operational inefficiencies can benefit from an energy or recommissioning programLANCE ENGLISH; DON HARRISBERGER20112011, vol.83, no.3
Single-Pipe System Given old College try for new School of Pharmacy Building: 'Easy'-to-install system saves material, labor costsScott Arnold20112011, vol.83, no.3
Getting to the root of a $20 million failure in a South Florida high-rise: Investigation Into the Failure of Chilled- Water-Pipe InsulationWILLIAM A. LOTZ20112011, vol.83, no.3
Analyzing Facility Energy UsageRON AUVIL20112011, vol.83, no.3
Planning for Energy-Efficiency Retrofit Projects: The four phases of an energy retrofit require flexibility and creative thinkingPROMOD KUMAR20112011, vol.83, no.3
Energy Is At The Heart Of It AllMICHAEL WEIL; Stephen J. Vamosi20112011, vol.83, no.3