中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2011, vol.52, no.1/4 2011, vol.52, no.5/8 2011, vol.52, no.9/12 2011, vol.53, no.1/4 2011, vol.53, no.5/8 2011, vol.53, no.9/12
2011, vol.54, no.1/4 2011, vol.54, no.5/8 2011, vol.54, no.9/12 2011, vol.55, no.1/4 2011, vol.55, no.5/8 2011, vol.55, no.9/12
2011, vol.56, no.1/4 2011, vol.56, no.5/8 2011, vol.56, no.9/12 2011, vol.57, no.1/4 2011, vol.57, no.5/8 2011, vol.57, no.9/12

题名作者出版年年卷期
Non-productive tool path optimisation of multi-tool part programmesAfef Afifi Afifi; David R. Hayhurst; Wasim Ahmed Khan20112011, vol.55, no.9/12
Surface textural analysis using acousto optic emission- and vision-based 3D surface topography - a base for online tool condition monitoring in face turningBalla Srinivasa Prasad; M. M. M. Sarcar; B. Satish Ben20112011, vol.55, no.9/12
Feedrate optimisation/scheduling on sculptured surface machining: a comprehensive review, applications and future directionsMustafa Kurt; Eyup Bagci20112011, vol.55, no.9/12
An optimization tool for operational tolerances allocation, work in process inventory minimization, and machines assignment in a discrete part manufacturing environmentSafwan A. Altarazi20112011, vol.55, no.9/12
Adaptive dimensional control based on in-cycle geometry monitoring and programming for CNC turning centerVasile Marinescu; Ionut Constantin; Cristian Apostu; Florin Bogdan Marin; Mihaela Banu; Alexandru Epureanu20112011, vol.55, no.9/12
Directional textures auto-inspection using principal component analysisSsu-Han Chen; Der-Baau Perng20112011, vol.55, no.9/12
A novel two-stage genetic algorithm for a mixed-model U-line balancing problem with duplicated tasksSeyed Mahmood Kazemi; Reza Ghodsi; Masoud Rabbani; Reza Tavakkoli-Moghaddam20112011, vol.55, no.9/12
The logical precedence network planning of projects, considering the finish-to-start (FS) relations, using neural networksSeyed Alireza Hashemi Golpayegani; Fereshteh Parvaresh20112011, vol.55, no.9/12
A nondominated ranked genetic algorithm for bi-objective single machine preemptive scheduling in just-in-time environmentKeyhan Rahmani; Iraj Mahdavi; Hadi Moradi; Hamid Khorshidian; Maghsud Solimanpur20112011, vol.55, no.9/12
Product data model for PLM systemYumei Li; Li Wan; Tifan Xiong20112011, vol.55, no.9/12
1234