中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0278-6125
刊名Journal of Manufacturing Systems
参考译名制造系统杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2013, vol.32, no.1 2013, vol.32, no.2 2013, vol.32, no.4

题名作者出版年年卷期
An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion timeFawaz S. Al-Anzi; Ali Allahverdi20132013, vol.32, no.4
Modeling and analysis of closed loop manufacturing systems using parameter couplingSheng Yang; Robert J. Riggs; S. Jack Hu20132013, vol.32, no.4
Dynamic schedule execution in an agent based holonic manufacturing systemTarun Kanti Jana; Bipradas Bairagi; Soumen Paul; Bijan Sarkar; Jyotirmoy Saha20132013, vol.32, no.4
Assessing the impact of quality determinants and user characteristics on successful enterprise resource planning project implementationJui-Sheng Chou; Jhih-Hao Hong20132013, vol.32, no.4
STEP-NC compliant approach for setup planning problem on multiple fixture palletsStefano Borgia; Andrea Matta; Tullio Tolio20132013, vol.32, no.4
A novel hybrid meta-heuristic algorithm for solving multi objective flexible job shop schedulingNasser Shahsavari-Pour; Behrooz Ghasemishabankareh20132013, vol.32, no.4
Optimizing a bi-objective multi-product EPQ model with defective items, rework and limited orders: NSGA-II and MOPSO algorithmsSeyed Hamid Reza Pasandideh; Seyed Taghi Akhavan Niaki; Sharareh Sharafzadeh20132013, vol.32, no.4
A bio-inspired mobile agent-based integrated system for flexible autonomic job shop schedulingYu-Cheng Chou; Huajun Cao; Harry H. Cheng20132013, vol.32, no.4
Multi-objective real-time dispatching for integrated delivery in a Fab using GA based simulation optimizationXiaokun Chang; Ming Dong; Dong Yang20132013, vol.32, no.4
Utilizing variant differentiation to mitigate manufacturing complexity in mixed-model assembly systemsHe Wang; Hui Wang; S. Jack Hu20132013, vol.32, no.4
1234567