中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0278-6125
刊名Journal of Manufacturing Systems
参考译名制造系统杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2015, vol.34 2015, vol.34, no. 2015, vol.35 2015, vol.36 2015, vol.37, no.Pt.1 2015, vol.37, no.Pt.2
2015, vol.37, no.Pt.3

题名作者出版年年卷期
A new statistical approach to automated quality control in manufacturing processesMilo, Michael W.; Roan, Michael; Harris, Bradley20152015, vol.36
An innovative approach for automatic generation, verification and optimization of part programs in turningBelfio, S.; Totis, G.; Sortino, M.20152015, vol.36
A hybrid algorithm based on fuzzy linear regression analysis by quadratic programming for time estimation: An experimental study in manufacturing industryAtalay, Kumru Didem; Eraslan, Ergun; Cinar, M. Oya20152015, vol.36
Solving a new multi-objective multi-route flexible flow line problem by multi-objective particle swarm optimization and NSGA-IIGhodratnama, A.; Jolai, F.; Tavakkoli-Moghaddam, R.20152015, vol.36
Function and process modeling for integrated product and manufacturing system platformsMichaelis, Marcel T.; Johannesson, Hans; ElMaraghy, Hoda A.20152015, vol.36
A geometrical model for surface roughness prediction when face milling Al 7075-T7351 with square insert toolsMunoz-Escalona, Patricia; Maropoulos, Paul G.20152015, vol.36
A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup timesNagano, Marcelo Seido; Araujo, Daniella Castro; Miyata, Hugo Hissashi20152015, vol.36
Optimization of layered manufacturing process for reducing form errors with minimal support structuresPaul, Ratnadeep; Anand, Sam20152015, vol.36
Two-echelon multi-product multi-constraint product returns inventory model with permissible delay in payments and variable lead timePriyan, S.; Uthayakumar, R.20152015, vol.36
Mutual effects of defective components in assembliesEben-Chaime, Moshe20152015, vol.36
123