中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0305-215X
刊名Engineering Optimization
参考译名工程最优化
收藏年代1998~2024



全部

1998 1999 2000 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2017, vol.49, no.1/3 2017, vol.49, no.10/12 2017, vol.49, no.4/6 2017, vol.49, no.7/9

题名作者出版年年卷期
Parallel implementations of the Complex-RF algorithmBraun, R.; Krus, P.20172017, vol.49, no.7/9
Cooperative parallel adaptive neighbourhood search for the disjunctively constrained knapsack problemQuan, Zhe; Wu, Lei20172017, vol.49, no.7/9
A novel algorithm using an orthotropic material model for topology optimizationTong, Liyong; Luo, Quantian20172017, vol.49, no.7/9
A region-segmentation combining surrogate model based on L-indicator and N-fold cross-validation techniqueLu, Hanan; Li, Qiushi; Pan, Tianyu20172017, vol.49, no.7/9
Energy absorption evaluation of reinforced concrete beams under various loading rates based on particle swarm optimization techniqueHanoon, Ammar N.; Jaafar, M. S.; Hejazi, Farzad; Aziz, Farah N. A. Abdul20172017, vol.49, no.7/9
An improved immune algorithm for optimizing the pulse width modulation control sequence of invertersSheng, L.; Qian, S. Q.; Ye, Y. Q.; Wu, Y. H.20172017, vol.49, no.7/9
An extension of the directed search domain algorithm to bilevel optimizationWang, Kaiqiang; Utyuzhnikov, Sergey V.20172017, vol.49, no.7/9
An inexact fuzzy bi-level programming model for energy-traffic system planning under uncertainty: a case study of Urumqi city, ChinaWang, S.; Huang, G. H.; Yao, Y.; Xie, Y. L.; Zhen, J. L.20172017, vol.49, no.7/9
Increasing production rate in U-type assembly lines with sequence-dependent set-up timesSahin, Murat; Kellegoz, Talip20172017, vol.49, no.7/9
Single-machine common/slack due window assignment problems with linear decreasing processing timesZhang, Xingong; Lin, Win-Chin; Wu, Wen-Hsiang; Wu, Chin-Chia20172017, vol.49, no.7/9
12345678910...