中国机械工程学会生产工程分会知识服务平台
主页
文献资源
外文期刊
外文会议
中文期刊
专业机构
生产工程
智能制造
高级检索
关于我们
版权声明
使用帮助
期刊
ISSN
1751-5254
刊名
European Journal of Industrial Engineering
参考译名
欧洲工业工程学杂志
收藏年代
2009~2024
全部
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2017, vol.11, no.1
2017, vol.11, no.2
2017, vol.11, no.3
2017, vol.11, no.4
2017, vol.11, no.5
2017, vol.11, no.6
题名
作者
出版年
年卷期
A mixed-integer programming-based heuristic for project scheduling with work-content constraints
Adrian Zimmermann
2017
2017, vol.11, no.6
Periodically aggregated resource-constrained project scheduling problem
Pierre-Antoine Morin; Christian Artigues; Alain Haáˉt
2017
2017, vol.11, no.6
The total adjustment cost problem with variable activity durations and intensities
Lucio Bianco; Massimiliano Caramia; Stefano Giordani
2017
2017, vol.11, no.6
Multi-objective binary cuckoo search for constrained project portfolio selection under uncertainty
Mohammed M.S. El-Kholany; Hisham M. Abdelsalam
2017
2017, vol.11, no.6
A decomposition heuristic for short-term planning of assessment centres
Tom Rihm; Norbert Trautmann
2017
2017, vol.11, no.6
An adaptive large neighbourhood search as a matheuristic for the multi-mode resource-constrained project scheduling problem
Patrick Gerhards; Christian Stá?rck; Andreas Fink
2017
2017, vol.11, no.6
国家科技图书文献中心
全球文献资源网
京ICP备05055788号-26
京公网安备11010202008970号 机械工业信息研究院 2018-2024