中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0305-215X
刊名Engineering Optimization
参考译名工程最优化
收藏年代1998~2024



全部

1998 1999 2000 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2020, vol.52, no.1/3 2020, vol.52, no.10/12 2020, vol.52, no.4/6 2020, vol.52, no.7/9

题名作者出版年年卷期
Min-max regret criterion-based robust model for the permutation flow-shop scheduling problemLiao, Wenzhu; Fu, Yanxiang20202020, vol.52, no.4/6
Research on common due window assignment flowshop scheduling with learning effect and resource allocationShi, Hui-Bin; Wang, Ji-Bo20202020, vol.52, no.4/6
Surrogate-assisted two-phase tensioning strategy optimization for the system transformation process of a cable-stayed bridgeWang, Xiaoming; Wu, Wentao; Liu, Yan; Ran, Zhun20202020, vol.52, no.4/6
Single-machine resource allocation scheduling with due-date assignment, deterioration effect and position-dependent weightsLiu, Weiwei; Yao, Yao; Jiang, Chong20202020, vol.52, no.4/6
Free material optimization with local stress constraints for laminated structuresWeldeyesus, Alemseged Gebrehiwot20202020, vol.52, no.4/6
A two-phase simulation-optimization cellular automata method for sewer network design optimizationZaheri, M. M.; Ghanbari, R.; Afshar, M. H.20202020, vol.52, no.4/6
A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resourceWang, Qiang; Liu, Changchun; Zheng, Li20202020, vol.52, no.4/6
Improved impact responses of a honeycomb sandwich panel structure with internal resonatorsLi, Q. Q.; He, Z. C.; Li, E.; Cheng, A. G.20202020, vol.52, no.4/6
Pareto Explorer: a global/local exploration tool for many-objective optimization problemsSchutze, Oliver; Cuate, Oliver; Martin, Adanay; Peitz, Sebastian; Dellnitz, Michael20202020, vol.52, no.4/6
A mathematical model and tabu search algorithm for multi-manned assembly line balancing problems with assignment restrictionsYilmaz, Hamid; Yilmaz, Mustafa20202020, vol.52, no.4/6
1234