中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0094-9930
刊名Journal of Pressure Vessel Technology
参考译名压力容器技术杂志;美国机械工程师学会汇刊
收藏年代1995~2024



全部

1995 1996 1997 1998 1999 2000
2001 2002 2003 2004 2005 2006
2007 2008 2009 2010 2011 2012
2013 2014 2015 2016 2017 2018
2019 2020 2021 2022 2023 2024

2022, vol.144, no.1 2022, vol.144, no.2 2022, vol.144, no.3 2022, vol.144, no.4 2022, vol.144, no.5 2022, vol.144, no.6

题名作者出版年年卷期
Design of Type 3 High-Pressure Vessel Liner (Al 6061) for Hydrogen VehiclesLee, Changhwan; Park, Gunyoung; Kim, Chul20222022, vol.144, no.6
Defect and Cluster Characterization: A Python-Based Plugin for Wellbore Integrity AnalysisNuhn, Zachary; Leong, Chad; Kolomytsev, Leonid; Le Calvez, Joel; Valstar, Dirk20222022, vol.144, no.6
Closed-Form Stress Intensity Factor Solutions for Circumferential and Axial Surface Cracks With Large Aspect Ratios in PipesAzuma, Kisaburo; Li, Yinsheng20222022, vol.144, no.6
The Use of an Equivalent Temperature Field to Emulate an Induced Residual Stress Field in a Rotating Disk Due to Full or Partial Rotational AutofrettagePerl, M.; Kamal, S. M.; Mulera, Solomon20222022, vol.144, no.6
Review of Seismic Fragility and Loss Quantification of Building-Like Industrial FacilitiesAlfanda, Abba Mas'ud; Dai, Kaoshan; Wang, Jianze20222022, vol.144, no.6
Floor Response Spectrum Method of Multiply Supported Piping System Assisted by Time History AnalysisTakayama, Yoshihiro; Yoshida, Ayaka; Iriki, Nobuyoshi; Maeda, Eiichi20222022, vol.144, no.6
Stability of Allowable Flaw Angles for High Toughness Ductile Pipes Subjected to Bending Stress in the ASME Code Section XIHasegawa, Kunio; Strnadel, Bohumir; Li, Yinsheng; Lacroix, Valery20222022, vol.144, no.6
Numerical Simulation on the Perforation Response of Pressurized Pipe Elbows Under Destructive Impact LoadingZhou, You; Zhang, Shuhua20222022, vol.144, no.6
A Study on Effects of Flaw Shape Idealization on the Interaction of Co-Planar Surface Flaws Subjected to Tension LoadSamadian, Kaveh; Hertele, Stijn; De Waele, Wim20222022, vol.144, no.6
Incident Case Study of Baseline Pigging During In-Line Inspections for Corrosion Resistant Alloy Clad PipelinesReda, Ahmed; Shahin, Mohamed A.; Sultan, Ibrahim A.; Lagat, Christopher; McKee, Kristoffer K.20222022, vol.144, no.6
123