中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0360-8352
刊名Computers & Industrial Engineering
参考译名计算机与工业工程
收藏年代1999~2023



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2003, vol.44, no.1 2003, vol.44, no.2 2003, vol.44, no.3 2003, vol.44, no.4 2003, vol.45, no.1 2003, vol.45, no.2
2003, vol.45, no.3 2003, vol.45, no.4

题名作者出版年年卷期
Flexible 4-day workweek scheduling with weekend work frequency constraintsHesham K. Alfares20032003, vol.44, no.3
Evolutionary approaches to the design and organization of manufacturing systemsH. Pierreval; C. Caux; J. L. Paris; F. Viguier20032003, vol.44, no.3
Activity time-cost tradeoffs under time and cost chance constraintsZohar Laslo20032003, vol.44, no.3
Using novelty detection to identify abnormalities caused by mean shifts bivariate processesF. Zorriassatine; J. D. T. Tannock; C. O'Brien20032003, vol.44, no.3
A hybrid two-stage flowshop with limited waiting time constraintsLing-Huey Su20032003, vol.44, no.3
Three stage no-idle flow-shopsNour El Houda Saadani; Alain Guinet; Mohamed Moalla20032003, vol.44, no.3
Decomposition of interdependent task group for concurrent engineeringShi-Jie (Gary) Chen; Li Lin20032003, vol.44, no.3
Scheduling of drilling operations in printed circuit board factoryJih-Chang Hsieh; Pei-Chann Chang; Lich-Chao Hsu20032003, vol.44, no.3
Solving large-scale requirements planning problems with component substitution optionsJoseph Geunes20032003, vol.44, no.3
Estimating operation times from machine center arrival and departure eventsManuel D. Rossetti; Gordon M. Clark20032003, vol.44, no.3
12