中国机械工程学会生产工程分会知识服务平台

期刊


ISSN1082-295X;2771-6384
刊名EC&M
参考译名电气施工与维修
收藏年代1998~2023



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023

1998, vol.97, no.1 1998, vol.97, no.10 1998, vol.97, no.10sup 1998, vol.97, no.11 1998, vol.97, no.12 1998, vol.97, no.13
1998, vol.97, no.2 1998, vol.97, no.3 1998, vol.97, no.4 1998, vol.97, no.5 1998, vol.97, no.6 1998, vol.97, no.8
1998, vol.97, no.9

题名作者出版年年卷期
Drives and the black cloud of power qualityN. D. Hayes19981998, vol.97, no.2
Engine Gen-Sets: investing in power reliability -- New Jersey-New York City bridge uses packaged twin 400 kW engine-generators to keep toll booths and roadway lighting operatingG. Scliffet19981998, vol.97, no.2
Fiber-optic data network coordinates cement plant operationJ. R. Knisley19981998, vol.97, no.2
Four key steps in performing a power site survey: use these steps as a starting point when troubleshooting power quality problemsK. Michaels19981998, vol.97, no.2
How much is this sump pump costing me?R. J. Lawrie19981998, vol.97, no.2
Natural gray isn't gray: code recognition for "natural gray" neutral insulation doesn't mean "gray" insulationF. P. Hartwell19981998, vol.97, no.2
Power reliability: an electrical system design for today's data centerR. J. Yester19981998, vol.97, no.2
PQ tip: sizing single-phase UPS systems -- Don't rely on the nameplate data of your workstation equipment to size a UPS; you also have to account for in-rush currents and cyclingJ. A. DeDad19981998, vol.97, no.2
Protecting generators from overloadL. Bey19981998, vol.97, no.2
Quality grounding and power quality: having your cake and eating it, tooW. H. Lewis19981998, vol.97, no.2
12