中国机械工程学会生产工程分会知识服务平台

期刊


ISSN0736-5845
刊名Robotics and Computer Integrated Manufacturing
参考译名机器人学与计算机集成制造
收藏年代1997~2023

关联期刊参考译名收藏年代
Computer Integrated Manufacturing Systems计算机集成制造系统1998~1998


全部

1997 1998 1999 2000 2001 2002
2003 2004 2005 2006 2007 2008
2009 2010 2011 2012 2013 2014
2015 2016 2017 2018 2019 2020
2021 2022 2023

2002, vol.18, no.1 2002, vol.18, no.2 2002, vol.18, no.3-4 2002, vol.18, no.5-6

题名作者出版年年卷期
Establishing and improving manufacturing performance measuresM. Munir Ahmad; Nasreddin Dhafr20022002, vol.18, no.3-4
Performance analysis and optimisation of shape recognition and classification using ANNFarhad Nabhani; Terry Shaw20022002, vol.18, no.3-4
Simulation of an optical sensing system for automatic object trackingHossein Golnabi20022002, vol.18, no.3-4
Impact of human error on lumber yield in rough millsUrs Buehlmann; R. Edward Thomas20022002, vol.18, no.3-4
Rules for integrating fast changeover capabilities into new equipment designDirk Van Goubergen; Hendrik Van Landeghem20022002, vol.18, no.3-4
The series-parallel replacement problemJ. C. Hartman; J. Ban20022002, vol.18, no.3-4
Unrelated parallel machine scheduling with setup times using simulated annealingDong-Won Kim; Kyong-Hee Kim; Wooseung Jang; F. Frank Chen20022002, vol.18, no.3-4
Diagnosis of multi-operational machining processes through variation propagation analysisQiang Huang; Shiyu Zhou; Jianjun Shi20022002, vol.18, no.3-4
Development of a placement time estimator function for a turret style surface mount placement machineKimberly P. Ellis; John E. Kobza; Fernando J. Vittes20022002, vol.18, no.3-4
Equipment replacement decisions and lean manufacturingWilliam G. Sullivan; Thomas N. McDonald; Eileen M. Van Aken20022002, vol.18, no.3-4
12